Hurricane Response


Hurricane IDA - 90 Days

Hurricane Harvey - 21 Days

Hurricane Laura - 36 Days

Optimum/Suddenlink

S College Relocate PH 1

3-mile relocate (Aerial to Underground)

S College Relocate PH 2

2-mile relocate placing 4x 2-inch conduit in some areas (Aerial to Underground) placing all service drops from aerial to underground.

William J Bryan Relocate

Relocated 3 miles of Aerial to Underground, placing all service drops from Aerial to Underground.

Placed all new fiber and coax fiber, pedestal, Vaults. Followed all bore profiles. All Fiber and Coax was cut over at night hours and converted the new system over at an efficient pace and had all customers up before 5 AM.

Williamson Drive Relocate

1-mile relocate (Aerial to Underground), placing all service drops from aerial to underground.

Hunters Crossing PH 1 (FTTH)

Placed 1.5 miles of 2-inch conduit, pulled fiber into existing joint trench pipe, and set all peds/vaults. Fiber Splicing JSO, PDO, V-HUB.

Brazos Valley WiFi

Calvert, TX

55 miles of Underground Construction (pipe, vaults, flowerpots)

Hearne, TX

65 miles of Aerial Construction (make ready, anchors, strand & fiber).

Franklin, TX

9 miles of underground Construction (pipe, vaults, flowerpots).